Introduction | Outline of Facilities | Brochures | Publications |
|
|
Year | JRR-3 | JRR-4 | NSRR | The tandem accelerator facility | The Radioisotope Production Facility |
1956 | Jul.27 ; Construction of homegrown reactor decided. | ||||
1957 | June isotope center concept (Atomic Energy Commission) | ||||
1958 | |||||
1959 | Dec. ; 2MV Van de Graaff(to Mar.2003) | ||||
1960 | Mar. ; 5.5MV Van de Graaff(to Sep. 1998) | ||||
1961 | March Construction of RI examination manufacturing facility | ||||
1962 | Sep.12 ; First criticality | Apr.7 ; Permitssion of reactor construction Jun.; Reactor construction work starts. |
Test manufacture of the short life RI is carried out. | ||
1963 | Oct.28 ; Power-up test to 4MW | ||||
1964 | Mar.31 ; Rated power of 10MW achieved. | ||||
1965 | Nov.11 ; Integrated power reaches 10,000MWh | Jan.28 ; First criticality. | |||
1966 | Apr.4 ; Shielding experiment fo atomic-powered ship starts. | ||||
1967 | Apr.6 ; Use of homegrown fuel starts. | ||||
1968 | Sep.20 ; Integrated operation time reaches 10,000 hrs. | ||||
1969 | Mar.6 ; Irradiation test for BNCT Mar.28 Low-temperature-fissiochemical-loop(LTFL)completed. |
Mar.1 ; Training reactor engineers starts. | |||
1970 | |||||
1971 | |||||
1972 | |||||
1973 | |||||
1974 | Oct.13 ; The sacred fire of the National Athletic Meet in Ibaraki lighted. ![]() |
||||
1975 | Sep.23 ; Integrated power reaches 10,000MWd. | Feb.7 ; Integrated power reaches 10,000MWh. | Jun.11 ; First criticality Fresh fuel experiments(Phase I Program) starts. ![]() |
||
1976 | Oct.28 ; Rated power of 3.5 MW achieved. | Feb. ; Accelerator ordered(NEC in USA) Dec. ; Construction of tandem building starts. |
|||
1977 | Jul.5 ; Silicon irradiation starts. | Dec. ; Pressure vessel installed. | |||
1978 | Nov. ; Tandem building completed. Dec. ; High voltage test starts. |
||||
1979 | |||||
1980 | May.22 ; 1,000 pulse operation achieved | Jul. ; Beam test starts. | |||
1981 | |||||
1982 | Feb.5 Dry-storage-facility(DSF) completed. | ||||
1983 | Mar.25 ; End of Joint-use operation. | Aug. ; Accelerator accepted. Sep. ; Steady operation starts. |
|||
1984 | Dec.9 ; Permission for modification | ||||
1985 | Aug.5 ; Modification starts | Mar.11 ; International course of reactor engineering education starts. | |||
1986 | From October to November ; Removal of reactor core all in one piece ![]() |
||||
1987 | Extension of the house for glared sample acceptance accompanying JRR-3 reconstruction | ||||
1988 | Mar.23 ; Integrated power reaches 40,000MWh. | ||||
1989 | Modification of experimental facilities and reactor control system for Phase II Program completed. Spent fuel experiments (Phase II Progtram) starts. Jul.5 ; 2,000 pulse operations achieved. |
||||
1990 | Mar.22 ; First criticality with modified JRR-3![]() Sep.7 ; A hundred hour continuous operation with maximum power of 20MW achieved. Nov.5 Joint-use operation starts. |
Aug. ; Construction of booster building starts. | |||
1991 | |||||
1992 | Mar.6 ; Integrated power reaches 50,000MWh. | Apr. ; Booster building completed. | |||
1993 | Sep.23 ; Integrated power reaches 10,000MWd. | Oct. ; Booster accelerator completed. | |||
1994 | Oct. ; Beam acceleration test with booster completed. | ||||
1995 | |||||
1996 | Jan.12 ; End of operation by HEU fuels(Integrated power 58,706MWh). Sep.19 ; Permission of revised construction-application for modification. |
||||
1997 | |||||
1998 | Jan.7 ; Permission for using silicide fuels | Jul.14 ; First criticality with LEU fuel core. ![]() Oct.6 ; joint-use oeration restarts. |
|||
1999 | |||||
2000 | |||||
2001 | |||||
2002 | Jun. ; Expanding tandem accelerator building starts. | ||||
2003 | Feb.; Formation of a super mirror of a thermal neutron lead pipe Mar.; Rearrangement of cold-neutron lead pipe C2-3 port by a neutron vendor |
Transfer acceptance of RI training section of Tokyo Komagome | |||
2004 | Dec.22 ; 3,000 pulse operations achieved. | ||||
2005 | Dec.23 ; Modification of experimental facilities for Phase III Program completed. | Installation of RNB accelerator completed.![]() |
|||
2006 | Jun.; Integrated power reaches 50,000MWd. | High burnup fuel and MOX fuel experiments (Phase III Progtam) starts. | |||
2007 | Aug.; The American Nuclear Society landmark prize award | ||||
2008 | |||||
2009 | Apr.;The Atomic Energy Society of Japan atomic power history construction prize award (in japanese) | Apr.;The Atomic Energy Society of Japan atomic power history construction prize award (in japanese) | Apr.;The Atomic Energy Society of Japan atomic power history construction prize award (in japanese) | Apr.;The Atomic Energy Society of Japan atomic power history construction prize award (in japanese) | |
2010 | |||||
2011 | |||||
2012 | |||||
2013 | |||||
Year | JRR-3 | JRR-4 | NSRR | The tandem accelerator facility | The Radioisotope Production Facility |