Introduction Outline of Facilities Brochures Publications

 JRR-3
 JRR-3 achieved its first criticality in 1962 as the first research reactor constructed with domestic technology and has been utilized by a multitude of researchers since the dawn of nuclear research and industry. In 1990, JRR-3 was modified to improve its performance, and it resumed operation as a high-performance and multipurpose research reactor with thermal power of 20 MW. JRR-3 has several facilities for neutron beam experiments, irradiation experiments for nuclear fuel and material, and production of RI and silicon semiconductors. Cold neutron (very low energy neutron) beams are available and utilized for research of life phenomena by analyzing the structure of polymer molecules, for example.

An outside view of the JRR-3 reactor building A bird's-eye view of the JRR-3 reactor building
An outside view of the JRR-3 reactor buildingA bird's-eye view of the JRR-3 reactor building
An outside view of the JRR-3 reactor building チェレンコフ光で青白く輝く炉心
A cutaway view of the JRR-3 reactor The reactor core and heavy water tank glowing
with the blue light of Cherenkov radiation




Specifications of JRR-3
Purpose: Beam experiments, Irradiation experiments of fuels and materials, RI production, Activation analysis, etc.
Type: Light water moderated and cooled, pool type reactor that uses low-enriched uranium
Maximum thermal power 20MW
Maximum thermal neutron flux Approximately 3×1018m-2s-1

Link to JRR-3 homepage Link to JRR-3 homepage